渡江战役纪念馆主体工程超长超重悬臂结构施工技术 被引量:4

Construction Technology of Super-long and Overweight Cantilever Structure in Main Project of Changjiang-crossing Campaign Memorial
在线阅读 下载PDF
导出
摘要 渡江战役纪念馆主体建筑造型像战舰,结构受力体系复杂。船头部位以4榀三角形钢筋混凝土悬挑桁架梁为主支撑结构体系,托起船头部位次梁、板,形成超长、超重悬臂结构。依据结构体系受力特点,在保证结构体系安全稳定性的前提下,合理划分了悬臂结构各施工工况,同时采用型钢与钢管组合高大模板支撑体系。通过项目实施过程中开展的施工监测研究分析,验证了技术方案的可靠性,确保了结构的安全性。 The main building of Changjiang-crossing Campaign Memorial looks like a warship. Four triangle reinforced concrete cantilever beams are designed as main supports of the bow to bear weight from secondary beams and boards,thus a super-long and overweight cantilever structure is built up. According to bearing characteristics,construction conditions of the cantilever structure are rationally defined under premise of keeping safety and stability of the system. At the same time,composition of section steel and steel pipes is used for large and high formwork. Monitoring results during construction process indicates that the technical scheme is reasonable and the structure is safe.
出处 《施工技术》 CAS 北大核心 2010年第5期74-78,共5页 Construction Technology
关键词 渡江战役纪念馆 悬臂结构 施工工况 高大模板支撑 施工技术 Changjiang-crossing Campaign Memorial cantilever structure construction condition support for large and high formwork construction technology
  • 相关文献

参考文献4

二级参考文献4

  • 1DB33/1035-2006,建筑施工扣件式钢管模板支架技术规程[S].
  • 2GB50017-2003.钢结构设计规范[S].[S].,..
  • 3JGJ130-2001.建筑施工扣件式钢管脚手架安全技术规范[S].[S].,..
  • 4中国钢结构协会.建筑钢结构施工手册[M].北京:中国计划出版社,2002.

共引文献27

同被引文献15

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部