结合青岛市游泳跳水馆工程,对工程总体、分部、分项的施工部署以及混凝土结构、钢结构、机电设备安装中的关键技术和创新技术进行总结,得出大型体育场馆在施工部署及施工技术上应重点考虑的关键问题,对实际工程具有较强指导意义.
In light with Qingdao City Swimming and Diving Hall project,this paper summarizes the key technology and innovative technique in the overall and division projects,the sub-deployment construction arrangement,the concrete structures,steel structures,mechanical and electrical equipment installation and reaches the solution to the crucial issues in the construction deployment and technology of a large stadium or gym,which is of great significance for the actual project.