摘要
蒲石河抽水蓄能电站上水库面板堆石坝混凝土施工质量控制着重于合理的配合比,同时控制好混凝土的拌和、运输、辅助入仓、浇筑、温控、养护等环节。对施工过程中存在的问题及时总结及时纠正或改善施工工艺。落实"三检制度",明确工序责任到人,争创优质工程。
The quality control of slab concrete construction of Pushihe pump - storage plant focuses on rational mix proportion and raw materials control. The procedures of concrete mixing, transportation, auxiliary concrete - conveying, placing, temperature control and curing were well controlled, the construction technology was improved and problems occurred during construction were addressed time- ly. The system of "three inspections" was implemented, the working process and responsibility was clarified to each person for the pur- pose of a quality project.
出处
《西北水电》
2010年第2期47-50,共4页
Northwest Hydropower
关键词
蒲石河
混凝土
控制
面板堆石坝
Pushihe
slab concrete
control
faced rockfill dams