城市全户内变电站主变压器室的通风散热要求与降低其噪声污染的要求是相互矛盾的。通过对南京市110kV淮海路变电站通风降噪设计方案及实施结果的研究,探讨目前110kV城市全户内变电站在主变压器室通风降噪矛盾方面的一些解决措施及其效果。
The requirement of the ventilation and noise reduction are conflictive in main transformer chamber of the urban indoor substation. Through the research on the design and implement of the ventilation and noise re- duction in 110 kV Huaihai Rd. substation in Nanjing, the conflicts between ventilation and noise reduction in main transformer chamber of the current 110 kV urban indoor substation are explored, resolutions and their effect are presented.
出处
《供用电》
2010年第2期39-41,77,共4页
Distribution & Utilization
关键词
城市全户内变电站
主变压器室
通风散热
降噪措施
urban indoor substation
main transformer chamber
ventilation and heat dispersion
noise reduction measures