期刊文献+

基于Petri网的敏捷化生产调度建模方法 被引量:19

Factory agile production scheduling modeling based on Petri net
在线阅读 下载PDF
导出
摘要 针对企业生产调度敏捷化程度不高、影响整个生产系统产能和效益最大化的问题,结合Petri网技术、面向对象方法和敏捷制造思想,提出了基于Petri网的敏捷化生产调度建模方法,开发了敏捷化生产调度建模的调度流程,研究得出了扩展的产能计算函数,建立了以产能瓶颈站点为调度核心,并向其他次产能瓶颈站点发散的敏捷化生产调度模型,直观、形象地反映了企业生产实时调度情况。通过实证研究,构建了产能函数,实现了对整个生产系统的全面调度,提升了瓶颈站点的产能,缩短了产品生产周期,提高了整个制造系统的效益。 To solve low agility in production scheduling problem of the manufacturing enterprises,an agile production scheduling modeling(APSM) method was proposed to maximize the capacity of whole production system,based on Petri net,object-oriented technology and agile manufacturing ideas.By developing APSM scheduling model and extending the traditional production capacity function,a new extended capacity function was obtained.An agile production scheduling model was established.In the model,capacity bottleneck stations were taken as the core of dispatching,then other stations were satisfied with pulling or pushing ways.The agile production scheduling model could directly reflect real-time production circumstances.Through the example of agile scheduling,bottleneck station capacity was enhanced,production cycle was shortened and the entire manufacturing system profit was increased.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第3期598-602,共5页 Computer Integrated Manufacturing Systems
基金 重庆市自然科学基金资助项目(2009BB3362) 重庆市教委科学技术研究资助项目(KJ08A06) 重庆大学"211工程"三期创新人才培养计划建设项目(S-09107)~~
关键词 PETRI网 敏捷化生产 调度 建模 瓶颈 产能 Petri nets agile production scheduling modeling bottleneck capacity
  • 相关文献

参考文献8

二级参考文献25

  • 1贾国柱.生产系统Petri网建模与仿真的优化方法[J].系统仿真学报,2006,18(Z2):559-562.
  • 2李登峰,陈守煜,程春田,熊德琪.多属性决策问题的模糊神经网络综合决策方法[J].系统工程理论方法应用,1995,4(2):45-52. 被引量:15
  • 3张绍阳,王选仓.基于Petri网的公路施工资源瓶颈识别和消除[J].长安大学学报(自然科学版),2006,26(1):38-42. 被引量:7
  • 4郭伏,张国君.应用SIMOGRAMS方法解决装配生产线瓶颈[J].工业工程与管理,2006,11(6):107-109. 被引量:7
  • 5ROSER C, NAKANO M, TANAKA M. Comparison of bottleneck detection methods for AGV systems[EB/OL]. [2008- 11-20]. http://www, informssim, org/wse03papers/147, pdf.
  • 6SUNG C S, CHOUNG Y I, HONG J M. Minimizing makespan on a single burn in oven with job families and dynamic job arrivals[J]. Computers and Operations Research, 2002,29 (8):995-1097.
  • 7CHAKRAVORTY S S, ATWATER J B. Bottleneck management:theory and practice [J]. Production Planning and Control,2006,17(5) :441-447.
  • 8ROSER C, NAKANO M, TANAKA M. Shifting bottleneck detection [J]. Winter Simulation Conference Proceedings, 2002,2(1) : 1079 -1086.
  • 9ZHOU J, LIU Z Q, HUANG P L, et al. Simulation diagnosis for the bottleneck of production lines and it's application[J]. Advances in Materials Manufacturing Science and Technology,2004,471-472:563-567.
  • 10HEINICKE M U, HICKMAN A. Eliminate bottlenecks with integrated analysis tools in eM-Plant[C]//Proceedings of 2000 Winter Simulation Conference. Washington, D. C., USA: IEEE, 2000 : 229-231.

共引文献21

同被引文献188

引证文献19

二级引证文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部