歪头山铁矿188西站西侧排土场大规模滑坡造成了采场北出口运输中断,为恢复生产,开展了该滑坡的勘探调查、滑坡机理分析及滑坡治理方案研究工作,提出了安全、可行、合理的综合治理方案。
The large scale slope slipe of the waste dump on the west of the station at 188 m level in Waitoushan Iron Mine caused the transportation interruption of the north exit of the stope.In order to recover the operation,an exploratory survey of the slope slipe,an analysis of its mechanism and an investigation on its control alternatives were made.As a result,a safe,feasible and rational comprehensive control scheme was put forward.
出处
《金属矿山》
CAS
北大核心
1998年第12期10-14,共5页
Metal Mine