摘要 在对东江制药厂Vc工程主要建筑物施工人工挖孔桩基础时,有11个挖孔桩因水量大,施工困难,加之大量抽水,造成地面塌陷,迫使施工暂停。针对这一问题,对人工挖孔桩进行了修复,并对其余建筑物的基础改为浅埋后,用高压旋喷注浆加固下卧软土层地基,取得了良好的效果。 In the process of laying the man holed piles foundations of main buildings for works Vc of Dongjiang pharmaceutical factory,the water retaining capacity in 11 man holed piles was so high that the construction was difficult,in addition,due to high pumping rate,the ground subsidence occurred and the construction was forced to stop temporarily.According to the problems stated above,the man holed piles were restored and the foundation of other buildings was changed into a shallow laying,then the high pressure jetgrouting was used to consolidate the underlying soft formation,with a good result.
作者 庄建安
机构地区 长沙矿山研究院
出处 《矿业研究与开发》 EI CAS 1998年第6期40-43,共4页 Mining Research and Development
关键词 人工挖孔桩 下卧软土层 高压旋喷注浆 地基加固 Man holed pile, Underlying soft formation, High pressure jetgrouting, Foundation consolidation
  • 相关文献

参考文献1

  • 1朱庆林等主编.旋喷注浆加固地基技术.北京:中国铁道出版社,1984.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部