摘要
在船坞工程的坞室施工中,坞墙位移控制是一个关键的质量控制点。以某大型船坞工程为例,分别从施工前、施工中、施工后叙述了坞墙位移控制的监理要点,供参考和借鉴。
The displacement control of the dock side wall of the shipyard is a key quality control point in the construction of shipyard engineering. Taking an example of one large shipyard engineering,this paper states respectively from three conditions,which are before construction,in construction and after construction,the key points of supervision in the displacement control of the dock side wall,which could of be referenced.
出处
《港口科技》
2010年第3期12-14,20,共4页
Port Science & Technology
关键词
船坞
坞墙
位移控制
施工
监理
shipyard dock side wall displacement control construction supervision