摘要
文中简介了石景山发电总厂灰渣综合治理完善化工程实施前后的工艺系统和工程改造后的系统调试及运行情况 ,对调试过程中出现的一些问题进行了分析 ,并提出了解决方案。
A description is made of the related processes used both before and after the perfection of comprehensive con- trol work for slag treatment,and the start-up and operating conditions of the new system.The paper makes an analysis of the problems encountered in system start-up and propos- es the countermeasures.
出处
《水力采煤与管道运输》
1998年第4期23-26,共4页
Hydraulic Coal Mining & Pipeline Transportation