摘要
梯级电站各计算断面多处无水文资料,本文选用呼图壁河流域水文站资料,根据规划区内已有的泥沙资料情况,对流域泥沙来源、时空分布进行分析,并根据石门水文站泥沙资料采用模数法推求梯级电站各计算断面泥沙。
Each calculate section in the step electricity station is a majority without hydrology data,this paper take datas on the hydrologic station of Hutubi river,according to the taked sand data situations in the plan area,analysis the source and space-time distribution of the river sand,and according to the sand datas of Shimen hydrology station,adopt modulus calculation to ascertain each calculate section sand data of the step electricity station.
出处
《中国西部科技》
2010年第6期8-9,共2页
Science and Technology of West China
关键词
石门水文站
六个计算断面
泥沙情况
Shimen hydrology station
Six calculate sections
Sand situations