摘要 随着我国铁路网建设的高速发展,穿越季节性冻土区的铁路数量及行车速度都在不断提高,由于高铁路基沉降所引发的危害也愈加严重。在考虑季节性冻土结构性、冻融循环的基础上建立了高速列车荷载长期作用下沉降量预测模型,给出了具体计算步骤;通过将模拟划分为若干个过程,实现了土体力学特征值的动态控制,避开了振波对土体应变影响的复杂性,使预测结果更加精确。 With the speedy construction of railway network in our country,the number of trains that run through the seasonal frozen earth area and their driving speeds are increasing accordingly;meanwhile the harms triggered by roadbed subsidence are growing even more serious.A predictive model of the roadbed subsidence under long-term load action of the high-speed trains is established considering the constitutive property of seasonal frozen earth and the freezing and thawing circle;concrete computation steps are presented;by dividing the simulation into several processes,dynamic control of the soil's mechanical characteristic values is obtained and the complex influence of vibrational wave on soil strain is avoided,which will leave the predictive result to be more precise.
出处 《安徽建筑》 2010年第1期77-77,99,共2页 Anhui Architecture
关键词 季节性冻土 高速铁路 路基 长期沉降 预测 seasonal frozen earth high-speed railway roadbed long-term subsidence predictive
  • 相关文献

参考文献5

二级参考文献35

  • 1李军世,李克钏.高速铁路路基动力反应的有限元分析[J].铁道学报,1995,17(1):66-75. 被引量:70
  • 2周神根.高速铁路路基基床设计[J].路基工程,1997(3):1-6. 被引量:16
  • 3王娴明,建筑结构试验,1990年
  • 4汪荣鑫,数理统计,1990年
  • 5伯野元彦,土木工程振动手册,1987年
  • 6张汝清,计算结构动力学,1986年
  • 7王其昌.高速铁路土木工程[M].成都:西南交通大学出版社,2000..
  • 8铁道科学研究院.京秦客运通道提速改造工程第一次实车运行试验研究报告[R].北京:铁道科学研究院,2000..
  • 9西南交通大学 兰州铁道学院.京秦客运通道提速改造工程动力仿真研究报告[R].成都:西南交通大学,兰州:兰州铁道学院,2000..
  • 10蔡英.高速铁路路基研究[R].成都:西南交通大学,1995.

共引文献221

同被引文献10

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部