摘要
白莲河抽水蓄能电站上库混凝土面板堆石坝建成已近1年,经过了2007年的雪灾、长时间低温和极大的温差考验,至今未发现裂缝。对该坝防裂技术措施予以介绍。
The CFRD of the upper reservoir of Bailianhe Pumped Storage Project has been completed nearly one year and stood up to the test of heavy snow, bitterly cold and extremely hot, but no concrete cracks have come about, the details of anti-crack measures are described.
出处
《水电与新能源》
2010年第2期63-65,共3页
Hydropower and New Energy
关键词
上库主坝
混凝土面板
防裂措施
CFRD of upper reservoir
concrete face slab
anti-crack measures