厚堆积层中大型竖井的开挖施工技术 被引量:1

Construction technique for a large shaft in deep bedded deposit strata
在线阅读 下载PDF
导出
摘要 一座水电站的大型出线竖井深度488.5 m,断面直径14.0 m,采用矿井法正向开挖方案,施工的关键是做好井口防护,控制爆破,监测井壁土层的变形,及时用锚杆加固及注浆,再衬砌井壁混凝土。 A large out-going line shaft (depth 488.5 m, diameter 14.0 m) of a hydropower station is built in deep bed- ded deposit strata with "shaft digging method", the important techniques in construction are: (1)making the top shaft well protection; (2)controlling the blasting operation carefully; (3) monitoring the deformation of the shaftwall and strengthening it timely by anchor bars and grouting; (4)going on concrete lining works.
作者 龙盎 樊义林
出处 《水电与新能源》 2010年第2期25-26,共2页 Hydropower and New Energy
关键词 深厚堆积层 竖井 矿井法 施工技术 deep bedded deposit shaft shaft digging method construction technique
  • 相关文献

参考文献4

二级参考文献21

  • 1马英明.立井厚表土层地压的理论与实践[J].中国矿业学院学报,1979,(2):45-69.
  • 2朱松耆.表土层中圆形竖井地压的计算[J].有色金属,1974,(5):13-19.
  • 3马英明.从井壁受力规律谈深井冻结井壁的结构和设计.中国矿业学院学报,1979,(4):59-74.
  • 4李文平,工程地质学报,1995年,1卷,45页
  • 5毕思文,中国科学院地质研究所工程地质力学开放研究实验室年报,1995年
  • 6王思敬,典型人类工程活动与地质环境相互作用研究.2,1995年
  • 7毕思文,博士学位论文,1995年
  • 8周治安,安徽地质,1993年,1卷,59页
  • 9毕思文,中国科学院地质研究所工程地质力学开放研究实验室年报,1993年
  • 10楼向东,中国科学院地质研究所工程地质力学开放研究实验室年报,1993年

共引文献91

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部