摘要
本文通过MRPⅡ与PERT间的对应关系,分析了用常规PERT工期估计法解决提前期估计问题的缺陷,提出了用蒙特卡洛模拟法解决此问题的思路与方法。
By means of the corresponding relationships of MRPⅡ and PERT,this paper analyzes the defects in determining the lead times by the usual estimating method to the cycle time of PERT.Then,it proposes a traick of thought and methods to determine the lead times by simulating in Monte carlo method. [WT5”HZ〗
出处
《系统工程与电子技术》
EI
CSCD
1998年第12期62-65,共4页
Systems Engineering and Electronics