拉西瓦水电站左岸消能区高边坡塔机安装技术

Installation Technology of High Slope Tower Crane on Left Bank Energy Dissipation Area of Laxiwa Hydropower Station
在线阅读 下载PDF
导出
摘要 文章阐述了拉西瓦水电站左岸消能区高边坡塔机基础土建施工及安装过程,由于受地理位置及现场施工条件的限制,塔机安装具有施工难度大、技术要求精、质量要求高、施工工艺复杂等特点。安装的塔机经监理工程师验收评定为优良工程,截至目前塔机运行状况良好,未出现任何异常现象。 The paper expounds foundation and installation process of high slope tower crane on left bank energy dissipation area of Laxiwa hydropower station,the tower crane installation possesses character of difficult construction,excellent technology,high quality and complex construction techniques because of the limitation of geographic position and construction condition.The installed tower crane has been appraised as excellent engineering by supervision engineer,and it obtains favorable operation condition without abnormal phenomenon until now.
出处 《青海电力》 2009年第A02期24-27,共4页 Qinghai Electric Power
关键词 塔机 高边坡 基础施工 安装 tower crane high slope foundation construction installation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部