摘要
在深基坑的设计施工过程中,对支护结构、基坑邻近建筑物、地下管线及周围土体等在理论分析指导下进行有计划的监测,以监测数据为依据,对基坑支护进行动态控制,是十分必要的。
During design and construction of deep foundation pit,the monitoring operation is based on theoretical analysis of the retaining structure,foundation pit adjacent building,underground pipeline and so on.And it is necessary to carry out dynamic control for foundation pit retaining structure in line with the monitoring date.
出处
《安徽建筑工业学院学报(自然科学版)》
2010年第1期35-38,共4页
Journal of Anhui Institute of Architecture(Natural Science)
关键词
深基坑
基坑支护
信息化
监测
Deep foundation pit
Foundation pit retaining structure
Informationization
Monitor