期刊文献+

采用短掘短砌加快斜井施工进度

Driving and Masonry Using a Short Section to Speed up the Construction Progress of Inclined Shaft
在线阅读 下载PDF
导出
摘要 5号措施斜井穿过强风化带和两个含水层,工程地质条件较差,给施工造成了极大的困难。采用短掘短砌施工方法,通过建立有效的临时排水系统,加强临时支护,优化爆破参数等技术措施,保证了施工质量和进度。 No.5 Measures' Inclined Shaft has gone through a strong weathered zone and two aquifers. Its engineering geological conditions are relatively poor, the construction is extremely difficult. During the construction process, we have adopted a Short Segment Driving and Masonry to build an effective temporary drainage system. And have strengthen the temporary support and optimized the blasting parameters such as technical measures to ensure the construction quality and progress.
出处 《中国锰业》 2010年第1期51-53,56,共4页 China Manganese Industry
关键词 斜井 强风化带 涌水量 超前支护 爆破参数 Inclined shaft Strong weathered zone Water inflow Advanced support Blasting parameters
  • 相关文献

参考文献2

  • 1董方庭.井巷设计与施工[M].徐州:中国矿业大学出版社,2004.
  • 2东兆星,吴士良.井巷工程[M].徐州:中国矿业大学出版社,2005.

共引文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部