上海宝地广场深基坑施工技术研究 被引量:7

STUDY ON CONSTRUCTION TECHNOLOGY FOR DEEP FOUNDATION PIT OF SHANGHAI BAODI'S PLAZA
在线阅读 下载PDF
导出
摘要 上海宝地广场周边环境复杂,施工中采用三轴搅拌桩止水,钻孔灌注桩和两道钢筋混凝土内支撑作围护结构,用二轴水泥土搅拌桩进行坑边、电梯井和集水井深坑加固。根据时空效应原理,确定了合理的开挖流程。结合采用信息化施工技术,确保了工程顺利进行。 According to the geological condition and the complex surrounding environment in Shanghai Baodi's Plaza, three axes agitating pile is used as water seal structure and bored pile is used as enclosure structure. Two axes agitating pile is used in order to strengthen pit side, elevator shaft and collector well. Based on the space-time effect principle, the procedure of excavation is determined reasonably. Finally, combining with the information construction technology, the project is built successfully.
出处 《建筑技术》 北大核心 2010年第3期198-200,共3页 Architecture Technology
关键词 深基坑 SMW工法 二轴搅拌桩 钻孔灌注桩 deep foundation fit SMW construction method two axes agitating pile bored pile
  • 相关文献

参考文献3

  • 1DGJ08-11-1999.地基基础设计规范[S].[S].,..
  • 2DBJ08-202-92钻孔灌注桩施工规程[S].1992.
  • 3DBJ08-61-1997.基坑工程设计规程[S].1997.

共引文献63

同被引文献24

引证文献7

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部