JIT系统下的单机提前/拖期调度问题 被引量:4

Early/Tardy Machine Scheduling Problem in JIT Systems
在线阅读 下载PDF
导出
摘要 分别研究了交货期及交货期窗口下的单机调度问题,目标是寻找一个最优调度极小化提前/拖期任务数.假设如果任务在交货期或交货期窗口内完工,则不受处罚;否则,就要受到一个固定的提前/拖期惩罚.提出了在交货期及交货期窗口下的寻找最优调度的多项式算法,并以两个实例说明了算法. It was done on a single machine to deal with due date and due window problems. The objective was to find a shcedule that minimizes the number of early and tardy jobs. It was assumed that each job was not penalized if its completion timed within due window. Otherwise,it would be penalized by the fixed identical weight. Two polynomial algorithms were presented to find the optimal schedule for due date and due window and two examples were shown to illustrate the algorithms.
作者 吴悦 汪定伟
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 1998年第6期599-601,共3页 Journal of Northeastern University(Natural Science)
基金 国家自然科学基金
关键词 JIT系统 最优调度 交货期 排序 调度 单机调度 JIT systems,optimal schedule,due date.
  • 相关文献

参考文献2

  • 1Cheng T C E,Eur J Oper Res,1989年,38卷,156页
  • 2Bagchi U,Naval Res Logist Quart,1986年,33卷,227页

同被引文献9

  • 1Gupta S K. N jobs m machines job-shop problems with sequence dependent setup times[J]. International Journal of Production Research, 1982,20:643-656.
  • 2Ragatz G L. A branch-and-bound method for minimum tardiness sequencing on a single processor with sequence dependent setup times[A]. Proceedings of 24th Annual Meeting of the Decision Sciences Institute[C]. Washington, 1993.1375-1377.
  • 3Tan K C, Narasinmhan R, Rubin P A, et al. A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times[J]. OMEGA: The International Journal of Management Science, 2000,28:313-326.
  • 4Rubin P A, Ragatz G L. Scheduling in a sequence dependent setup environment with generic search[J]. Computers & Operations Research, 1995,22(1):85-99.
  • 5Tan K C, Narasimhan R. Minimizing tardiness on a single processor with sequence-dependent times: a simulated annealing approach[J]. OMEGA: The International Journal of Management Science, 1997,25:619-634.
  • 6Gagne C, Price W L, Gravel M. Scheduling a single machine with sequence dependent setup times using ant colony optimization[R]. Quebec: University of Quebec, 2003.
  • 7Ibaraki T. Enumerative approaches to combinatorial optimization: part Ⅰ[J]. Annals of Operations Research, 1987,10(1-4):1-340.
  • 8Ibaraki T. Enumerative approaches to combinatorial optimization: part Ⅱ[J]. Annals of Operations Research, 1987,11(1-4):341-602.
  • 9Glover F, Gutin G, Yeo A, et al. Construction heuristics for asymmetric TSP[J]. European Journal of Operation Research, 2001,129:555-568.

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部