目前明挖法施工地铁车站一般有施工周期长、占地面积大、污染环境等问题,为了解决目前地铁车站施工问题,本文提出了一种新型的非开挖施工技术—曲线顶管法,该工法施工车站从开挖到结构全部采用非开挖技术在地下完成。本文针对该工法的施工过程和曲线顶管施工设备进行了介绍。
To solve the problems in the current subway station construction by cut and cover method, such as long - term construction period, large site areas, environment pollution, and so forth, this paper presents a new construction method curve pipe jacking method, which enables us to excavate foundation pit and construct structure by trenchless technology underground, and highlights the process and construction facilities of this method.
出处
《地下空间与工程学报》
CSCD
北大核心
2010年第1期135-137,178,共4页
Chinese Journal of Underground Space and Engineering
关键词
地铁车站
非开挖
曲线顶管
subway station
trenchless method
curve pipe jacking