摘要
桥梁基础施工中双壁钢围堰发生倾斜、偏转后,桥梁桩基础又出现断桩后利用压浆技术进行处理是成功的,在草袋土围堰和单壁铜围堰下有砂砾石覆盖层时,利用压浆技术封底固结天然河床而完成堰内的抽水明挖施工工艺做了介绍。
According to the engineering practice, how to make use of technology of forcing pulp, as the bridge pile foundation and coffered foundation are under construction, is discussed.
出处
《岩土工程技术》
1998年第4期37-39,共3页
Geotechnical Engineering Technique
关键词
压浆工艺
事故处理
围堰止水
桥梁
桩基工程
bridge foundation technology of forcing pulp accident treatment prevention water of coffer