摘要
简要介绍了连云港庙二突堤扩建 7~ 1 0万吨级码头的方案设计分析过程 ,提出了作者的观点 。
In this paper,the writergives a briefintroduction on design and analysis of the scheme to recon- struct and extend No.2 pier of7× 1 0 4 ~ 1× 1 0 5t in Miaoling,Lianyungang Port,and expresses his own viewpoints,and then the writer shows his own analysis about advantage and disadvantage on the design.
出处
《淮海工学院学报(自然科学版)》
CAS
1998年第4期64-67,共4页
Journal of Huaihai Institute of Technology:Natural Sciences Edition