Simulation analysis of temperature control calculation of RCC gravity dam in the cold region
Simulation analysis of temperature control calculation of RCC gravity dam in the cold region
摘要
In this paper, regarding the actual conditions of a roller compacted concrete dam, three-dimensional finite element relocating mesh method is utilized to simulate and calculate the temperature field of the RCC dam during the construction stage and operating period. The calculation is well consistent with the actual construction process, the thin-layer pouring process the pouring temperature and all kinds of external loads involved being taken into account, By comparing and analyzing of the impact of the cold wave on the dam stress, important references are provided for the RCCD design and the temperature control during construction.
参考文献8
-
1Reo T. K., Barth G. J., Miller J. R.. Computer model prediction of heating, soaking and cooling time in batch annealing. Iron and Steel Engineer, 1983, 60(9): 22-33.
-
2Anton J. Rovlto, William M. Aiello, George F. Vose. Batch anneal coil cold spot temperature prediction using on-line modeling at LTV. Iron and Steel Engineer,1991, 9 31-17.
-
3Robert A. Enghofer, Thomas E. Mueller. Experience with 100% hydrogen annealing at LTV's Indiana Harbor No.3 sheet mill. Iron and Steel Engineer, 1990: 25-29.
-
4LIN Lin. Study of annealing thermal process in high performance hydrogen bell-type annealing furnace.Doctoral dissertation, Beijing University of Science and Technology, 2003.
-
5ZHANG Hai-tao. Research on different inner covers performances in HPH bell-type annealing furnaces. Master dissertation, Beijing University of Science and Technology, 2005.
-
6The Design Reference Data of Industrial Furnace for Steel Company. Book Concern of Metallurgical Industry, 1977.
-
7WANG Bin-quart. Design Handbook of Industrial Furnace. Book Concern of Mechanical Industry, 1996.
-
8LU Da-you. Radiation Heat Transfer in Engineering. Book Concern of Defence Industry, 1998.
-
1ZHANG Xiao-fei LI Shou-yi CHEN Yao-long.Discussion and study on contraction joints for RCC gravity dam[J].Journal of Energy and Power Engineering,2009,2(3):13-17.
-
2宋永嘉,丰帅.碾压混凝土坝温控防裂探讨[J].中国水运(下半月),2009,9(1):148-149. 被引量:4
-
3杨道林,宋维见,张庆苓,郝中立.某碾压混凝土重力坝温控仿真分析研究[J].中国水运(下半月),2011,11(9):88-89. 被引量:1
-
4郭加宏.泵站双进水口进水池内三维湍流的数值计算[J].排灌机械,2004,22(5):7-11. 被引量:2
-
5孙军梅,孙霞,魏涛.某水利工程总干渠水位降落速度控制计算[J].中国水运(下半月),2011,11(8).
-
6刘川顺,刘祖德,王长德.河堤背水侧采用盖重土层的渗流控制计算[J].武汉水利电力大学学报,2000,33(2):27-30. 被引量:8
-
7张宽宝,赵二平,刘洪卫.瑞丽江水电站压力钢管道混凝土浇筑速度控制[J].云南水力发电,2011,26(3):1-2. 被引量:3
-
8厍海鹏.碾压混凝土的研究现状与发展趋势[J].山西建筑,2012,38(2):107-109. 被引量:2
-
9谢卫东.溪洛渡水电站大坝混凝土温度控制[J].湖南水利水电,2010(4):44-46. 被引量:3
-
10王守和.黑龙江省某电站混凝土浇筑温度计算[J].黑龙江水利科技,2015,43(6):85-86.