摘要
采用合理的运输及吊装工艺,整体吊装运输128m3高炉斜桥,在高炉建设施工过程中缩短了工期、降低了安装费用、保证了高炉建设顺利完成。
Because of using proper transporting and hanging processes,the whole transporting of inclined bridge of 128m 3 blast furnace have been done,thus the working time is shorted and the mounting coat is decreased in the process of blast furnace construction.
出处
《山东冶金》
CAS
1998年第5期25-26,共2页
Shandong Metallurgy
关键词
高炉
斜桥
吊装
整体运输
blast furnace,inclined bridge,hang,whole transport