摘要
系统分析了龙首矿目前的生产格局和重点项目建设基本情况,在科学论证的基础上,规划了龙首矿2014年实现500万t出矿目标的阶段步骤,研讨了龙首矿建设500万t大型井下矿山存在的主要问题,从建设管理、回采工艺、劳动效率、资源保障等方面相应提出了切实可行的对策和措施。
This paper systematically analyzes the layout of production and the basic situation of major construction projects at present in Longshou mine, plans the stages and steps to realize the goal of annual ore output of 5 million tons in 2014, discusses the main problems of the large - scale underground mining engineering construction for the annual 5 million tons in this mine, and proposes practical countermeasures and measures in terms of the management of construction projects, mining technology, working efficiency and the guarantee of resources, etc.
出处
《矿业研究与开发》
CAS
北大核心
2009年第6期101-105,共5页
Mining Research and Development
关键词
矿井建设
生产规模
回采工艺
资源保障
Mine construction, Production capacity, Mining technology, Guarantee of resources