摘要 澜沧江西藏境内规划河段长317km,河流多年平均流量481—676m3/s,落差877m,水力资源丰富。但由于其地处青藏高原东南部的横断山脉,其区域构造稳定条件、工程地质条件极为复杂。本文在论述其基本地质条件的基础上,分析了水电开发存在的主要工程地质问题,希望对前期勘察工作有一定的指导作用。 The planned reach on Lancangjiang river in Tibet is 317km long, with a multi -year average flow ot 491 676 m3/s and a drop of 877m, where it is rich in water resources. Because its cross - sectional mountains are located in the southeastern part of Qinghai - Tibet plateau, its regional tectonic stable conditions and engineering geological conditions are extremely complex. The paper analyses the main engineering geological problems of hydro- power development based on the discussion of basic geological condition and hopes to have some guidance for pre - survey work.
作者 肖万春
出处 《水电勘测设计》 2009年第4期14-17,共4页
关键词 基本地质条件 澜沧江西藏境内规划河段 水电开发 主要工程地质问题 前期勘察 basic geological condition planned reach on Lancangjiang river in Tibet hydropower development main engineering geological problem pre -survey work
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部