无砟轨道黄土路基工后沉降控制方法探析

Analysis of Controlling Settlement after Construction of Unballast Track Loess Subgrade
在线阅读 下载PDF
导出
摘要 湿陷性黄土地基上的无砟轨道,其路基的工后沉降控制是时速300~350公里客运专线建设面临的一大课题。由于湿陷性黄土工程性质的复杂性,必须对黄土地基采取必要的加固措施,以消除其湿陷性;对于用改良土填筑的路基本体、基床底层应确定严格的施工工艺和方法,确保压实质量和标准;同时,对路基沉降进行科学合理的监测,利用曲线回归方法预测工后沉降量。路基工后沉降控制是一项复杂的系统工程。 A great task tor construction of 300-350km/h passenger transport line is to control loess subgrade settled behind filled later of unballast tracks on the collapsible loess foundation. Because of complexity of the collapsible loess engineering properties, necessary reinforcing measures must be taken to remove its collapsibility for loess foundation; strict construction technique and methods should be determined by body and bottom layer of subgrade bed filled with improved soil to ensure compaction quality and standard. Meanwhile, scientific reasonable monitoring of subgrade settlement should be conducted and curve regression method should be used to forecast settlement after construction. Control of settlement after construction is a complex systematic project.
出处 《价值工程》 2010年第2期207-209,共3页 Value Engineering
关键词 无砟轨道 黄土路基 工后沉降 控制方法 unballast track loess subgrade settlement after construction, methods of control
  • 相关文献

参考文献3

二级参考文献5

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部