期刊文献+

塑料模并行设计研究 被引量:2

Design of mould for plastics based on concurrent engineering
在线阅读 下载PDF
导出
摘要 分析了塑料模设计过程,将并行工程思想应用于塑料模设计中,以解释结构模型法(ISM)为基础,划分了模具设计中各活动的级别,经过优化重组,得到了能体现并行设计特点的塑料模设计过程结构模型,反映了并行环境下塑料模设计过程的规律。 The design process of mould for plastics was analyzed. A new design method was proposed in which concurrent engineering technique was adopted and the activity levels of mould design were partitioned based on interpretive structural modeling theory. Through optimal recombination, a structure model of the design procedure of mould for plastics that can reflect features of concurrent design and design rules was obtained.
出处 《模具工业》 2010年第1期6-10,共5页 Die & Mould Industry
关键词 塑料模 并行工程 解释结构模型法 mould for plastics concurrent engineering interpretive structural modeling (ISM)
  • 相关文献

参考文献8

二级参考文献13

  • 1范玉青.波音公司的无纸设计/制造技术[J].计算机辅助设计与制造,1996(6):6-9. 被引量:8
  • 2李伯虎 蒋新松.并行工程(第二届中国CIMS学术会议论文集)[M].深圳,1992.1-11.
  • 3薄建 王先逵.并行工程下面向制造设计过程与方法初探.并行工程技术交流演示会论文[M].,1997.121-129.
  • 4蒋新松 李伯虎(等).1994年自动化领域专家委CE考察团访美报告——并行工程产品开发过程的集成[M].中国兵器工业第二一零所、北京先进柔性集成制造技术咨询中心,1994,8..
  • 5[3]HUAMIN ZHOU and DEQUN LI. A Numerical Simulation of the Filling Stage in Injection Molding Based on Surface Model. 2001, Advances in PolymerTechnology,20(2): 1~7.
  • 6Smith D E. et al. Analysis and sensitivity analysis for polymer injection and compression molding[J]. Computer Methods in Applied Mechanics and Engineering, 1998,167(3-4):325-344
  • 7Park S J, Kwon T H. Thermal and design sensitivity analyses for cooling system of injection mold, part 2: design sensitivity analysis[J]. Journal of Manufacturing Science and Engineering, 1998,120(2):296-305
  • 8Chan F T S, et al. In-line process conditions monitoring expert system for injection molding[J]. Journal of Materials Processing Technology, 2000,101(1):268-274
  • 9Chin K S, Wang T N. An expert system for injection mold cost estimation[J]. Advances in Polymer Technology, 1995,14(4):303-314
  • 10Rogers K J. Injection molding: expert system are coming on line now[J]. Modern Plastic International, 1991,21(5):44-48

共引文献12

同被引文献9

  • 1李志刚.中国模具工程大典[M].第1卷.北京:电子工业出版社.2007.
  • 2J SUN,Y F ZHANG-A,Y C NEE.A distributed multi- agent environment for product design and manufactur- ing planning[J].Intemational Journal of Production Re- search,2001,35(1/2):117-120.
  • 3J BLAZEWICZ,J K LENSTRA,A H G R KAN.Schedul- ing subject to resource-constraints:classification and complexity[J].Discrete Applied Mathematics,1983(5):ll-24.
  • 4DEMEULAMEESTER E HERROELEN-W.A branch-and- bound procedure for the multiple resource-constrained project scheduling[J].Management Science,1992,38(12): 1803-1818.
  • 5H K ALFARES,J E BAILEY.Integrated project task and manpower seheduling[J].IIETransaetions,1997,29(9): 711-717.
  • 6O BELLENGUEZ-MORINEAU,E NERON.A branch-and- bound method for solving muhi-skillproject scheduling problem[J].RAIRO-Operations Research,2007,41 (2): 155-170.
  • 7SIMON D.Biogeography-based optimization[J].IEEE Trans- cations on Evolutionary Computation,2008(6):702-713.
  • 8李德群.我国模具CAD/CAE/CAM/PDM发展现状及发展建议[J].电加工与模具,2010(B04):41-44. 被引量:5
  • 9闫纪红,吴澄,姜浩.产品开发活动的并行规划[J].计算机集成制造系统-CIMS,2001,7(2):6-9. 被引量:10

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部