摘要
本文考察了A2/MBBR工艺在长期运行下对模拟生活污水的净化效能,在水力停留时间为6.8h,溶解氧为1.5~2.5mg·L-1的条件下,在厌氧、缺氧及好氧区内,C/P、DO、有无内回流设备对废水中N和P的去除效果的影响。
Investigation of A2/MBBR for recovery the city wastewater were performed. The effeet of C/P,DO and cireumfluence on the removal of N and P were studied in detail. When HRT was 6.8h, DO was1.5-2.5mg·L^-1.
出处
《化学工程师》
CAS
2009年第12期37-40,59,共5页
Chemical Engineer
基金
内蒙古工业大学重点研究项目(ZD200705)