客运专线32m整孔箱梁架设施工技术 被引量:9

Construction Technology for 32m Whole-span Box Girder Erection in Passenger Dedicated Line
在线阅读 下载PDF
导出
摘要 结合达成铁路客运专线32 m整孔箱梁架设的施工,总结了DF900D型导梁式定点起吊架桥机架设整孔箱梁施工工艺,并提出了安全质量控制措施,为以后的整孔箱梁、大吨位桥梁架设提供了施工技术指导。 As the construction of the passenger dedicated line started in an all-round way in China, the construction technology of 900 t whole-span box girder erection has been widely used. In this paper, with the construction technology of 32 m whole-span box girder erection in Dacheng Passenger Railway, we summarize the erecting construction technology of the whole-span box girder by DF900D fixed-point lifting bridge erection machine, and put forward the safety and quality control measures, to provide technical guidance for the erection of the whole-span box girder or large-tonnage bridge in the future.
作者 郭华
出处 《铁道建筑技术》 2009年第12期39-43,共5页 Railway Construction Technology
关键词 客运专线 整孔箱梁 架桥机 运梁车 passenger dedicated line whole-span box girder bridge erection machine flat bed
  • 相关文献

参考文献1

二级参考文献4

  • 1.GB50017-2003,钢结构设计规范[S].北京:中国计划出版社,2003..
  • 2铁道部高速办.京沪高速铁路运架设备研制技术条件[M].2003.9.
  • 3TB10213-99,铁路架桥机架梁规程[S].北京:中国铁道出版社,1999.6.
  • 4GB3811-83,起重机设计规范[S].北京:中国标准出版社,1989.3.

共引文献2

同被引文献15

引证文献9

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部