云雾山隧道岩溶发育特征及治理 被引量:5

The Karst development characteristics and countermeasure of Yunwushan Tunnel
在线阅读 下载PDF
导出
摘要 对隧道揭示岩溶、岩溶特征及处理措施进行了详细介绍,并对不同岩溶类型提出针对性的治理对策。同时强调在遭遇大规模高压富水充填溶腔时,对宏观地质背景的分析和认识在决定治理方案时的重要作用。提出长大岩溶隧道施工时遇到大规模岩溶时有针对性的采用绕避方案,及时调整施工组织,确保工期目标的实现。 The revealed karst, karst features and treatment measures are described in detail, and different types of karst-specific countermeasures are put up. At the same time, it is stressed that in the encounter of largescale high-pressure water-rich cavity filling, macro-scopieal analysis and understanding of the geological background governs in determining the treatment schedule. The by-pass schedule pertaining to large-scale karst cavities during construction is put up, and relatively construction organization is modified to ensure the project term target. All these can provide reference for the construction of the long karst tunnels.
作者 薛斌 张民庆
出处 《中国工程科学》 2009年第12期61-68,共8页 Strategic Study of CAE
关键词 云雾山隧道 岩溶 发育特征 治理 Yunwushan Tunnel Karst development characteristics countermeasure
  • 相关文献

参考文献2

  • 1铁道第四勘察设计院.宜万铁路宜昌至万州段新建工程施工图-云雾山隧道设计图[R].武汉,2004,12.
  • 2铁道第四勘察设计院.宜万线长大岩溶隧道专项地质勘察-云雾山隧道工程地质勘察报告[R].武汉,2004.3.

共引文献1

同被引文献60

引证文献5

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部