期刊文献+

大直径风动潜孔锤引孔技术在含漂石砾砂层预制桩施工中的应用与研究 被引量:16

The Application and Research of the Large Diameter Air Operated Down Hole Hammer in Guiding-hole for Pile-sinking at the Layer of Gravel and Boulders Mixed Together
在线阅读 下载PDF
导出
摘要 本文介绍了大直径风动潜孔锤首次应用于含漂石砾砂层的预制桩沉桩施工,成功解决了复杂地层管桩沉桩难题的实例,对工程地质条件进行了分析,并对大直径预应力管桩引孔工艺及参数进行了论述。最后,讨论了潜孔锤沉桩过程中遇到的问题,并提出了相应的处理措施。 This text introduces the example the large diameter air operated down hole hammer was used in guidinghole for the first time, solving the difficult problem that the prestressed concrete pipe piling sank in the layer of gravel and boulders mixed together. Analyzed the engineering geological conditions and discussed the guide-hole technology and parameter. Finally, the text raised the corresponding measures which meet with the problem in the process of pile sinking.
出处 《广州建筑》 2009年第5期70-72,共3页 GUANGZHOU ARCHITECTURE
关键词 风动潜孔锤 预应力混凝土管桩 引孔 air operated down hole hammer prestressed concrete pipe pile guide-hole
  • 相关文献

参考文献1

二级参考文献2

共引文献6

同被引文献74

引证文献16

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部