海南联网工程是我国第一个500kV超高压、长距离、大容量的跨海联网工程。其中跨越琼州海峡的海底电缆工程是整个工程关键。本文介绍了海南联网海缆敷设施工的基本步骤,以及几种防护的实施。
The Hainan Interconnection Project is the first 500 kV cross-strait power grid connection project in China featured by high voltage, long distance and great capacity. The submarine cable project that crosses the Qiongzhou Strait holds the key of the whole project. The article introduces the fundamental procedures of cable laying and the implementation of some protection measures of the Hainan lnterconnection Project.
出处
《南方电网技术》
2009年第5期25-26,共2页
Southern Power System Technology
关键词
海南联网
海底电缆
电缆敷设
Hainan Interconnection Project
submarine cable
cable laying