摘要
本文结合工程实际,介绍了对超长、超大面积无需设置后浇带,无缝连续或间歇施工及裂缝控制技术中的应用。
This combination of engineering practice,it was study that the implementation of the long,large area without installed after belt,the application of seamless constructionand continuous or intermittent cracks in control technology.
出处
《福建建材》
2009年第6期75-77,共3页
Fujian Building Materials
关键词
超大
超长混凝土连续性
裂缝
工期
效益
super
super-long concrete continuity
cracks
period
benefits