外高桥三期工程1000MW塔式锅炉及捞渣机的特点及评价

Characteristic and Review of Tower-type Boiler and Submerged Scraper Conveyor in Waigaoqiao Project Phase Ⅲ
在线阅读 下载PDF
导出
摘要 外高桥三期工程采用了国内自主设计的首台1 000 MW超超临界塔式锅炉和首台与1 000 MW配套的一级输送刮板捞渣机。通过一级输送和两级输送捞渣机的对比,该工程选择的捞渣机在槽体、斜升段、干链返回段等各部分均有独到的设计,实现了高可靠性。该工程的塔式锅炉在锅炉效率、炉膛烟气温度均匀性、降低脱硝催化剂堵塞的概率、减少汽轮机固体颗粒侵蚀等方面有着良好的表现,对此进行了理论分析。 The first domestic-made 1 000 MW supercritical tower-type boiler and Submerged Slag Conveyer (SSC) are equipped in Waigaoqiao Project Phase Ⅲ. The SSC is of one-stage type and special designed for trough, raising part and returning chain. The tower-type boiler presents good aspects on boiler efficiency, gas temperature uniformity, decrease the block possibility of SCR catalyst and prevention small particle erosion (SPE) on turbine, which are analyzed theoretically.
作者 高玮 叶勇健
机构地区 华东电力设计院
出处 《锅炉技术》 北大核心 2009年第6期9-12,36,共5页 Boiler Technology
关键词 1000 MW 超超临界机组 塔式锅炉 捞渣机 1 000 MW Ultra-supercritical pressure unit tower type boiler submerged scraper conveyer
  • 相关文献

参考文献6

二级参考文献8

  • 1冯伟忠.外高桥二期2×900MW工程调试工作特点及回顾[J].上海电力,2005,18(2):111-117. 被引量:7
  • 2冯伟忠.外高桥二期2×900MW工程调试工作特点及回顾[J].西北电建,2005(2):25-29. 被引量:3
  • 3冯伟忠.1000MW级火电机组旁路系统作用及配置[J].中国电力,2005,38(8):53-56. 被引量:54
  • 4DL/T831-2002.大容量煤粉燃烧锅炉炉膛选型导则[S].[S].,..
  • 5Dr. Bernd. Epple, prof. A.C. Benim, CRFD Study of supercritical 2 × 900 MW Boilers for Shanghai/P. R. China,Vol Conference, Combustion and Firing Systems, "20th German flame day, 4^th-5^th september, 2001, Essen, Germany.
  • 6郝雁涛,王毅.1 000 MW塔式炉钢结构的设计和施工[R].上海:上海锅炉厂有限公司,2006.
  • 7W.Kessel,G.Scheffknecht.First 900 MW supercritical boilers in China.A new generation of coal fired power stations[J].Power-Gen Europe,2000,20-22.
  • 8Wang Meng-hao.Trouble occurred during operation with reference of some imported large capacity unitility boilers in China[R].Shanghai Power Equipement Research Institnte,2003.

共引文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部