分析福建水口水电站枢纽下游河道变化情况,介绍解决枯水期通航及机组稳定运行问题的坝下水位治理工程设计方案。
This paper analyces the river course variation downstream the junction of Shuikou hydropower station in Fujian,and in troduces the engineering design scheme for the water level harnessing downstream the dam in order to solve the problem of mavigatio dwring dry season and stable operation of the generating units.
出处
《水运工程》
北大核心
2009年第11期128-133,共6页
Port & Waterway Engineering
关键词
水口水电站
通航建筑物
发电厂房
水位下降
河床下切
治理工程方案
Shuikou Hydropower Station
navigation structure
powerhouse
lowering of water level
riverbed incision