摘要
本文主要论述了秦岭特长隧道施工降温的措施和现场测试资料的分析,为我国以后在修建长大隧道中的施工降温问题提供了经验。
This paper mainly describes the cooling measures and analysis of test information on site during construction of Qinling tunnel and it can be taken as a reference for similar problems during future construction of long &. large tunnels in China.