期刊文献+

综放工作面采放系统设备能力的合理配套 被引量:13

THE RATIONAL EQUIPMENT MATCHING OF COAL MINING AND CAVING SYSTEM IN FULLY MECHANIZED SUB LEVEL CAVING FACE
在线阅读 下载PDF
导出
摘要 综放工作面采放设备能力的合理配套,能充分发挥综采设备的生产能力,提高采煤机开机率和工作面单产.在现场实测数据基础上,以综放工作面采放工序最大限度平行作业为准则,建立了双输送机综放工作面前后部刮板输送机的能力配套计算方法,并确定了相应的计算参数.计算结果表明,影响综放工作面前后刮板输送机能力配套的主要因素是综放工作面采放高度比. The rational equipment matching of coal cutting and caving system in fully mechanized sub level caving coal face can make fully use of the capability of equipment, increase the operating rate of capacity and monthly production. Based on the data measured in site, the calculation method of the capacity matching between the front and the rear scraper conveyors is established, and the calculation parameters are determined by the principle of maximum parallel operation in mining and caving processing. The calculating result shows that the main influence factor of the capacity matching between the front and the rear scraper conveyors in the working face is the ratio of the mining and caving height.
作者 郑行周
出处 《煤炭学报》 EI CAS CSCD 北大核心 1998年第5期502-506,共5页 Journal of China Coal Society
关键词 综采 放顶煤 刮板输送机 设备能力 配套 采煤 high production and efficiency, fully mechanized sub level caving, scraper conveyor, equipment capacity
  • 相关文献

参考文献2

  • 1郑行周,1996年
  • 2郑行周,煤炭科学技术,1994年,22卷,11期,46页

同被引文献177

引证文献13

二级引证文献80

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部