摘要
结合毛坝1号隧道左线ZK297+640涌水塌方段实例,研究并实施了自进式锚杆结合小导管预注双液浆的施工方案,方案经过实施,取得了良好效果。
Combining with the collapsing and gushing water instance of Maoba No. 1 tunnel ZK297 + 640 left line, this thesis studies and implements the program of combining the serf-feeding anchor rod with ductule double-liquid grouting and achieves good results.
出处
《铁道建筑技术》
2009年第11期79-81,88,共4页
Railway Construction Technology
关键词
隧道塌方
自进式锚杆
小导管
注浆加固
tunnel collapsing
self-feeding anchor rod
ductule
grouting reinforcement