摘要
介绍了燕化集团公司炼油事业部联合装置1Mt/a中压加氢改质装置改造为0.6Mt/a柴油加氢精制装置的设计、生产情况。
The 1 Mt/a medium pressure hydrogenation unit was transformed into a diesel hydrotreating unit of 600 kt/a in 1998 located at the Refinery.It has been put into operation in July 14,1998 and a qualified product has been produced from the unit transformed. The transformation and design and the production condition are introduced,and the problems in the production also.
出处
《石化技术》
CAS
1998年第4期198-200,共3页
Petrochemical Industry Technology