摘要
与以往的核电机组设计不同,第三代压水堆AP1000核电机组蒸汽发生器的结构和支撑设计比较独特,这决定了AP1000机组蒸汽发生器的安装工艺将与已建核电机组蒸汽发生器的安装有所不同。介绍了AP1000机组蒸汽发生器的支撑结构及其安装特点,提出了AP1000机组蒸汽发生器的安装工艺。
The design of AP1000 NPP steam generator structure and supports is particular from other' s NPP SG, which decides its different installation scheme and procedures from installed SG. The paper introduces AP1000 SG support structures and characteristic of AP1000 SG installation, and provides the installation process of AP1000 NPP SG.
出处
《电力建设》
2009年第11期87-89,共3页
Electric Power Construction