摘要
分析了现浇混凝土空心楼盖的工艺原理,介绍了现浇混凝土空心楼盖的工艺流程,并提出了具体的操作要点,以积累现浇混凝土空心楼盖施工经验,推广现浇混凝土空心楼盖的应用。
Technological principle of cast-in-place concrete hollow floor is analyzed.Based upon introduction of technological process of this kind of floor,some practical operation key points are proposed in order to accumulate experiences for construction of cast-in-place concrete hollow floor and promote the application of this kind of floor.
出处
《山西建筑》
2009年第33期146-147,共2页
Shanxi Architecture
关键词
现浇混凝土空心楼盖
施工技术
工艺流程
操作要点
cast-in-place concrete hollow floor
construction technology
technological process
operation key points