摘要
根据工程项目特点,结合拟建工程所在区域的地质条件,合理选择了地基处理方案,指出采用换填垫层法取代CFG桩复合地基对加快工程建设进度和节省工程建设投资产生积极的效果,对于后续项目的工程设计和建设具有重要的指导意义。
According to the characteristics of project,and combining with the regional geological conditions of the project,the paper selects reasonable foundation treatment scheme,points out the adoption by using the replacement cushion method to take the place of CFG pile composite foundation,and indicates it is meaningful to speed up the construction process and to save construction investment,so it has the direction significance for the project design and construction in following project.
出处
《山西建筑》
2009年第33期110-111,共2页
Shanxi Architecture