期刊文献+

考虑水头影响的梯级水电系统优化调度算法研究 被引量:3

Optimal Scheduling Algorithm for Head-dependent Cascaded Reservoirs
在线阅读 下载PDF
导出
摘要 提出一种基于Lagrangian松驰技术的梯级水电系统优化调度算法,能够综合处理离散运行区间、最小启停机时间等离散约束、水库间的水力耦合网络约束以及水头影响。基于实际系统数据的数值验证表明了本算法的有效性和实用性。 A new algorithm for scheduling head-dependent cascaded reservoirs within the Lagrangian relaxation framework is presented. The algorithm can systematically consider discontinuous operating regions, discrete operating constraints such as minimum up/down times, the head-dependent power output and hydraulic coupling among reservoirs. Numerical testing based on a practical power system shows that the algorithm is computationally efficient and practicable.
出处 《控制与决策》 EI CSCD 北大核心 1998年第6期647-652,共6页 Control and Decision
基金 国家杰出青年基金 863计划 美国李氏基金
关键词 梯级水电系统 优化调度 水头影响 电力系统 cascaded hydro power systems scheduling, head-dependent reservoirs, mixed-integer programming, nonlinear network flow method
  • 相关文献

参考文献6

  • 1Guan X,IEEE Irans PWRS,1997年,4期,1775页
  • 2Guan X,Proc of the 28th North American Power Symposium. MIT,1996年,17页
  • 3Guan X,IEEE Trans PWRS,1995年,10卷,2期,772页
  • 4Guan X,IEEE Trans PWRS,1994年,9卷,2期,1023页
  • 5Yan H,IEEE Trans PWRS,1993年,8卷,3期,1358页
  • 6Guan X,Int J Electr Power Energy Syst,1992年,14卷,1期,9页

同被引文献34

  • 1翟桥柱,管晓宏,郭燕,孙岚,范炜.具有混合动态约束的生产系统优化调度新算法[J].自动化学报,2004,30(4):539-546. 被引量:8
  • 2邹进,张勇传.三峡梯级电站短期优化调度的模糊多目标动态规划[J].水利学报,2005,36(8):925-931. 被引量:20
  • 3胡国强,贺仁睦.梯级水电站多目标模糊优化调度模型及其求解方法[J].电工技术学报,2007,22(1):154-158. 被引量:29
  • 4胡国强,贺仁睦.梯级水电站长期多目标模糊优化调度新模型[J].电力自动化设备,2007,27(4):23-27. 被引量:12
  • 5R. W. Ferrero, J. F. Rivera, S. M. Shahidehpour. A Dynamic Program- ming Two - Stage Algorithm for Long - Term Hydrothermal Scheduling of Multireservoir Systems [J]. IEEE Transactions on Power Systems, 1998, 13(4): 1534-1540.
  • 6Xiaohong Guan, Ernan Ni, etc. An Optimization - Based Algorithm for Scheduling Hydrothermal Power Systems with Cascaded Reservoirs and Discrete Hydro Constraints [ J]. IEEE Transactions on Power Systems, 1997, 12(4) : 1775 - 1780.
  • 7F. J. Heredia, N. Nabona. Optimum Short - Term Hydrothermal Sched- uling with Spinning Reserve through Network Flows [ J ]. IEEE Trans- actions on Power Systems, 1995, 10(3): 1642-1651.
  • 8Shyh - Jier Huang. Enhancement of Hydroelectric Generation Schedu- ling Using Ant Colony System Based Optimization Approaches [J]. IEEE Transactions on Energy Conversion, 2001, 16(3) : 296 -301.
  • 9Chao-Ming Huang,Hong-Tzer Yang,Ching-Lien Huang.Bi-objective power dispatch using fuzzy satisfaction-maximizing decision approach. IEEE Transactions on Power Systems . 1997
  • 10Broyden CG.The convergence of a class of double-rank minimization algorithms 1. General considerations. Journal of the Institute of Mathematics and its Applications . 1970

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部