摘要
主要介绍了南京枢纽贯通CTCS-2级列控系统的大号码道岔弯股信息连续性可供选择方案的优缺点对比,并说明了实施方案的选择原则。
In this paper, the advantages and disadvantages of several optional schema of the information continuity of bending track of the points with large number in the run-through project of CTCS-2 level control system for the hub of Nanjing are compared, together with the principle of selecting implementation schema.
出处
《铁道通信信号》
2009年第10期15-17,共3页
Railway Signalling & Communication