摘要
介绍沙市盐卡码头采用开口大直径钢管桩穿透7m厚抛石层的成功经验,分析钢管桩能穿透厚抛石层的主要原因,进而对有关钢管桩穿透护岸抛石层的设计与施工问题提出见解和建议。
Abstract The successful experience of adopting large-diameter open steel pipe pile to penetrate the 7m thick rubble layer in Shashi Yankou Wharf is introduced. The main reason that the steel pipe pile is able to penetrate rubble layer is analyzed, and some views and suggestions concerning design and construction of steel pipe pile penetrating the rubble layer of bank protection are put forward.
出处
《水运工程》
北大核心
1998年第10期67-70,共4页
Port & Waterway Engineering