摘要
通过对国电北仑电厂三期工程(2×1000MW)超超临界机组热控调试,对机组DCS、DEH、主辅机TSI、联锁保护、协调控制等存在的问题进行分析,并逐一提出了应对措施,进一步提高了机组的自动化水平,确保了机组的安全运行。
The paper analyses problems and countermeasures for thermal control system debugging in ultra-supercritical unit of third-phase project in Guodian Beilun power plant, which mainly includes Distributed Control System, DEH, Main & Assit Machine TSI, Interlock Protect system, automatic control system and so on. It can provide some references for power plant control system debugging.
出处
《浙江电力》
2009年第5期20-24,共5页
Zhejiang Electric Power
关键词
超超临界机组
热控
调试
问题
对策
ultra supercritieal unit
control system
debugging
problem
countermeasure