摘要
在岩溶地质隧道施工中,经常遇到涌水以及大小不同的溶洞影响工程施工问题,本文重点探讨了隧道岩溶段地下水、小型溶洞以及规模较大溶洞的处理措施。
The water gushing and the different-size karst caves are often met in the tunnel construction under the karst geological conditions.The measures to treat the groundwater,the small karst caves and the large scale karst caves existed in karst sections of tunnel are discussed.
出处
《工程勘察》
CSCD
北大核心
2009年第11期48-50,共3页
Geotechnical Investigation & Surveying
关键词
岩溶地质隧道
施工处理
措施
karst geological tunnel
construction treatment
measure