期刊文献+

下坂地水库大坝抗震设计 被引量:5

Seismic design of Xiabandi reservoir dam
在线阅读 下载PDF
导出
摘要 下坂地水库地处高地震区,大坝基础覆盖层厚度达150m,且存在可能液化砂层和软土层,地质条件十分复杂,大坝抗震设计是工程设计的重点和难点。 Xiabandi reservoir is located in a high seismic zone and the overburden in the dam foundation is up to 150 m deep. Moreover, the geological conditions are very complicated with possible liquefied sand layer and soft soil layer. Therefore, dam seismic design is the focus and difficult point in the engineering design. The paper briefly describes the seismic design of Xiahandi reservoir dam.
出处 《西北水电》 2009年第5期39-42,60,共5页 Northwest Hydropower
关键词 下坂地水库 沥青混凝土心墙砂砾石坝 地震液化 抗震稳定性 动力分析 Xiabandi reservoir sand gravel dam with asphalt concrete core earthquake liquefaction selsmic stability dynamic analysis
  • 相关文献

同被引文献70

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部