装备系统转场时间研究对于装备系统快速反应能力的设计与评价意义重大,从3个方面分析装备系统转场时间的影响因素,包括:装备系统规模、转场活动和所需资源、运输站点之间的拓扑结构。给出各类转场活动时间的计算方法,分析各转场活动时顺的确定原则和依据,建立描述各个转场活动之间时序与逻辑的关系矩阵,在此基础上给出装备系统转场时间计算方法。并以实际应用案例加以佐证,为装备系统转场时间分析提供方法和范例。
Equipments system transit time calculation is important for equipment system rapid deployment capacity design and evaluation. Three Equipment system transit temporal hours impact factors were analyzed, includes: equipment system scale, transit activities and required resources, topology structure among transportation station. All kinds of transit activities time calculation methods are given. Analyze transit activities sequences ascertain principle and evidence. Relationship matrix which described time and logic relation among transit activities is constructed. Based on before analysis, equipments system transit time calculation method is presented. A practical application case was given to prove, it provides the method and example to equipment system transmit time.
出处
《兵工自动化》
2009年第11期89-92,共4页
Ordnance Industry Automation
关键词
装备
后勤
可靠性
Equipment
Logistics
Reliability